Skip to content

Customer Satisfaction

Walking Tunnel

  • Cumberland Valley School District
  • Connects the campus of Winding Creek Elementary School to Mountain View Middle School
  • Post tensioned with conduits and junction boxes roughed in for lighting
  • Multi section wing walls

Princeton Health Care Campus

  • Designed to be cast in place but Monarch took on the challenge to submit a precast alternative, offering cost and time savings to the contractor
  • 32 foot long sloped outlet structure weighing over 30 tons
  • 8 point lift
  • Precast outlet box, frost footers and sloped sections all delivered and installed with the assistance of Monarch Products
  • Custom made 35’ long aluminum trash rack with cast in mounting pockets

Park City Wegmans – Crossings at Conestoga Creek Box Culvert

  • Custom outlet control end sections
  • Over 15’ wide
  • Dual escorts required
  • Culvert and End sections delivered and installed with the assistance of Monarch Products

Flow Through Planters

  • Custom designed by Monarch to meet the customer’s needs
  • Flow through planter box with built in trench drains
  • 25 Feet Long
  • Over 25 Tons each.
  • 32 built and Delivered by Monarch Products

Architectural Endwalls

  • Layout and design by the team at Monarch Products
  • Custom formliners carefully installed in our formwork
  • Detailed accents added through custom painting
Contact us now for a quote. Contact